Why Every Homeowner in Pakistan Is Installing Solar Before June – Don’t Miss Out!

Why Every Homeowner in Pakistan Is Installing Solar Before June 
It’s no secret — summer is brutal in Pakistan. Whether you live in
Lahore, Islamabad, Gujranwala, Sialkot, or anywhere in Punjab, you know the drill:

  • Long hours of load-shedding
  • Soaring electricity bills
  • Unbearable indoor temperatures

That’s exactly why thousands of homeowners across Pakistan are rushing to install solar panels before June 2025. If you’re still on the fence, this blog explains why now is the time, not later.
Why Every Homeowner in Pakistan Is Installing Solar Before June

We’ll cover the benefits of installing before summer peaks, potential savings, delays you can avoid, and how Eco Green Solar can help you make the switch — fast and hassle-free.

 Why June Is Too Late

By June, most solar installation companies are:

  • Overbooked for 3–4 weeks
  • Out of stock on panels or inverters
  • Delayed in net metering approvals due to backlog

That means if you book in June, your system might not be operational until July or even August — missing 2–3 months of peak sunlight savings.

 Top 5 Reasons to Install Solar Before June

 1. Beat the Summer Electricity Crisis

Summer months in Pakistan bring:

  • Up to 16 hours/day of AC, fans, and water motor usage
  • Bills jumping to Rs. 50,000–90,000/month
  • Load-shedding during the hottest hours

Installing in April or May ensures:

  • Immediate energy production
  • Relief from June’s WAPDA shockers
  • Peace of mind with uninterrupted cooling

 2. Start Saving When the Sun Is Strongest

The average daily solar radiation from April to August is 5.8–6.5 kWh/m² in Lahore, Multan, and Islamabad. This is the most productive season for solar systems.

  • Earlier installation = More units produced
  • More units = Bigger net metering credits
  • Bigger credits = Lower (or zero) WAPDA bills

 3. Faster Net Metering Approval

If you install in April, your net metering can be approved and active by June.

But if you wait until June?

  • Your file may be stuck until August
  • You’ll lose the chance to sell extra units back to the grid during summer

 Net metering alone can offset Rs. 10,000–30,000/month if activated in time.

 4. Installers Are Available (For Now)

Most reputable installers like Eco Green Solar are still operating with:

  • Short booking slots
  • Inverter/panel availability
  • 3–5 day turnaround time

Once June begins:

  • Demand triples
  • Prices rise
  • Bookings delay up to 1 month

 5. Enjoy Faster ROI and Payback

Summer is when you consume (and save) the most — this shortens your payback period dramatically.

System Size Avg Monthly Savings ROI Time if Installed in April
5kW Rs. 15,000–18,000 3.5–4 years
10kW Rs. 30,000–35,000 3 years
15kW Rs. 40,000+ 2.5–3 years
20kW Rs. 55,000–60,000 2–2.5 years
  • Earlier installation = Quicker payback
  •  More sunlight = Higher energy generation

 Who Is Installing Solar Right Now?

  • DHA Phase 5, Lahore – 10kW for Rs. 9.5 Lac – Saving Rs. 32,000/month
  • Bahria Town, Lahore – 15kW system for Rs. 12 Lac – Saving Rs. 45,000/month
  • Johar Town – 5kW system for Rs. 7.5 Lac – Saving Rs. 15,500/month
  • Model Town – 20kW system for Rs. 15.5 Lac – Saving Rs. 60,000/month

Join the hundreds of families already experiencing the power of solar in 2025.

 What’s Included with Eco Green Solar Packages?

  •  N-Type Bi-Facial Solar Panels
  •  IP65 Certified On-Grid Inverters
  •  Net Metering Filing with LESCO/IESCO/FESCO
  •  Galvanized Steel Structure
  •  25-Year Panel Warranty
  •  10-Year Inverter & Structure Warranty
  •  Installation in 2–4 Days

 Optional Monthly Maintenance for Just Rs. 1000

 Don’t Fall for These Common Delays

  •  Waiting for the June Bill
    By then, the heat is already hurting your wallet.
  •  Waiting for Prices to Drop
    Panel prices may drop slightly, but inverter/duty costs usually rise near summer.
  •  Waiting for Load Shedding to Improve
    WAPDA won’t fix this — but solar will.

 Areas We Serve

  • Lahore
  • Islamabad
  • Sialkot
  • Faisalabad
  • Gujranwala
  • Kasur, Sheikhupura & more
    Eco Green Solars Social Share

 Ready to Power Up Your Home Before June?

Whether you’re looking to eliminate your electricity bill, become energy independent, or simply live more sustainably, this is your moment.

📞 Call/WhatsApp: +92 319 9903998
🌐 Visit: icon.ecogreensolars.com
📍 MM Tower, Plaza 54, KB Commercial Road, KB Colony, Lahore

🔖 #SolarForHomeowners #EcoGreenSolar #SolarPakistan #InstallBeforeJune #NetMeteringPakistan #SolarInLahore #SolarEnergySavings #GoSolar2025 #OnGridSystems #ElectricityBillReduction

Share on:

WhatsApp
Facebook
LinkedIn
Twitter